RUNWAYS AND LANDING AIDS
RWY 01
Dimension: Length 2214 m Width 35 m
SURFACE: Asphalt PCN 56 F/B/X/T
THR ELEV: 250.7 ft
TDZ ELEV: ---.0 ft
THR COORD: 582312.25N 0153057.58E
Transverse slope.
Last 1200 m of RWY non
cambered, single crossfall
from left to right.
Arresting net beyond THR 29
DECLARED DISTANCES
TORA: 2214 m
TODA: 2634 m
ASDA: 2404 m
LDA: 2214 m
APPROACH AND RUNWAY LIGHTNING
APCH LGT: Calvert, 750 m
VASIS: PAPI
LED lights: -
RWY 01: EFAS (Electronic Flashing Approach System)
MIL marker boards 600 m
from RWY end.
Arresting net beyond THR 19
RWY 19
Dimension: Length 2214 m Width 35 m
SURFACE: Asphalt PCN 56 F/B/X/T
THR ELEV: 295.4 ft
TDZ ELEV: ---.0 ft
THR COORD: 582420.18N 0153140.44E
Transverse slope.
First 1200 m of RWY non
cambered, single crossfall
from right to left.
Arresting net beyond THR 11
DECLARED DISTANCES
TORA: 2214 m
TODA: 2814 m
ASDA: 2324 m
LDA: 2214 m
APPROACH AND RUNWAY LIGHTNING
APCH LGT: Barrette CL, CAT 1, 735 m
VASIS: PAPI
LED lights: -
RWY 01: EFAS (Electronic Flashing Approach System)
MIL marker boards 600 m
from RWY end.
Arresting net beyond THR 19
RWY 08
Dimension: Length 1870 m Width 37 m
SURFACE: Asphalt PCN 48 F/B/X/T
THR ELEV: 309.0 ft
TDZ ELEV: ---.0 ft
THR COORD: 582405.88N 0153056.13E
DECLARED DISTANCES
TORA: 1870 m
TODA: 1870 m
ASDA: 1910 m
LDA: 1870 m
APPROACH AND RUNWAY LIGHTNING
APCH LGT: -
VASIS:-
LED lights: -
MIL marker boards 600 m
from RWY end.
Arresting net beyond THR 19
RWY 26
Dimension: Length 1870 m Width 37 m
SURFACE: Asphalt PCN 48 F/B/X/T
THR ELEV: 278.0 ft
TDZ ELEV: ---.0 ft
THR COORD: 582413.01N 0153250.47E
Transverse slope.
First 1200 m of RWY non
cambered, single crossfall
from right to left.
Arresting net beyond THR 11
DECLARED DISTANCES
TORA: 1870 m
TODA: 1870 m
ASDA: 1910 m
LDA: 1870 m
APPROACH AND RUNWAY LIGHTNING
APCH LGT: -
VASIS: -
LED lights: -
REMARKS :
Apron:
Self-maneuvering /Pushback. Marshalling mandatory.
RWY 01/19: MIL configuration
RWY 08/26: MIL configuration